Clients:
BERGER/ABAM Engineers, Inc., Federal
Way, WA,
Stevedoring Services of America, Inc., and Americana Shipping
Lines, Inc.
Phase One for this new international terminal
project required the design of two 69kv, 12 MVA substations
to provide power at 15kv to serve the facilities via approximately
8 miles of underground conduit systems. Phase One also utilized
a 14,450 Hp electrical dredge for channel deepening powered
from the substation. The wharf area will be served by four
electric post-panamax cranes